| COUNTY OF EL DORADO |
DEPARTMENT OF TRANSPORTATION |
 |
U.S. 50 Mainline Widening at El Dorado Hills
CIP Project No.
53120
|
|
 |
|
| Project Description:
Part of a larger project along US 50 in El Dorado Hills area which is phased to align the improvement needs, staged construction and available funding. This project will construct a new westbound auxiliary lane on US 50 between the Silva Valley Interchange and the Empire Ranch Interchange. The new lane would utilize some existing excess median/shoulder width (re-stripe) as well as an exterior sliver widening in the vicinity of the HOV CHP enforcement area. Between the El Dorado Hills Interchange and the County Line the new lane would utilize existing excess median/shoulder width (re-stripe only). Project requires coordination with the Silva Valley Interchange (71328), Empire Ranch Interchange and El Dorado Hills Interchange (71323). Construction should be concurrent with the Silva Valley Interchange and/or Empire Ranch Interchange.
|
| View On Microsoft Live Maps™
|
| Click image to view larger |
Click image to view larger |
 |
 |
| U.S. 50 Mainline Widening at El Dorado Hills (# 53120) |
U.S. 50 Mainline at El Dorado Hills Blvd. Interchange (aerial photo) |
| |
| Project Milestone Schedule |
Estimated Completion Date |
| PA&ED - Project Approval & Environmental Document |
Beyond Five Years* |
| PSE - Plans, Specifications & Estimates |
Beyond Five Years* |
| Advertise for Construction/Award Contract |
Beyond Five Years* |
| Construction Complete |
Beyond Five Years* |
|
| Total Estimated Project Cost:
$2,499,594
|
|
| |
| Project Status:
Currently being updated
Last Updated:
10/23/09 |
| |
| Project Contacts: |
| Project Manager: |
|
|
Send Email |
| Deputy Director: |
Craig McKibbin |
(530) 621-5900 |
Send Email |
|
| |
| Board of Supervisor District: | District 1, Supervisor:   John Knight | | | District 2, Supervisor:   Ray Nutting
|
|